Customization: | Available |
---|---|
Temperature: | Ordinary Temperature |
Connection Form: | Thread |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Suitable gas types | town gas |
Closing modes | current impulse or manual |
Body | wrought aluminum alloy |
Driving Voltage | DC 6-24V |
Sealing material | NBR rubber |
Close time | <1sec |
Operation temperature | -10~50C |
Explosion proof mark | Exmb twoT4 |
Pressure max | 10kpa |
Lead wire | 0.4m |
Connection | G1/2",G3/4",G1" |
Turn on | manual |
Working Principal
When the switch is pressed, the capacitor discharges and provides an electric current so that a coil can generate strong magnetic held to pull down the valve, achieving the closing within one second.
Emergency Shut Off Valves
Operation instruction
1.There are two ways to close the valve:
(a)An electric impulse of 1 sec (DC 9V),or
(b)Press the red knob (must open the protective cover first ). After this operation, the valve remains closed.
Note: the protective cover must remain on position at all time.
2.When the valves is closed,manually pull the red knob up to turn it on .then the valve remains on.
Note:the valve may not to be pulled up if gas pressure on both sides(inlet and outlet) is not balanced. Take necessary action to ensure that they are balanced ,then pull the knob up again,force pulling it may result in damage to the valve.
3.The valve will close automatically when it detects strong vibrations. Should this feature fails, notify the contractor or manufacture for repair.
4.After closing ,careful inspection is required.Do exercise caution when the valve needs to be turned on again.
Installation Requirements
1. Only request contractor can install this valve.
2 .The valve must be installed after the indoor main valve.
3 .A valve should be installed in the gas flow direction marked on the valve body. The coil must not be placed in downward position A valve may be installed horizontally or vertically.
4. the valve control wires should be connected correctly. White indicates positive while black stands for negative. Mismatch lends to fatal consequences.
5. During pipe maintenance, such as pressurized pipe cleaning .the valve should removed to avoid damages to the valve sealing.
6.During pressure tests, the valve should be turned on.
7.The valve's opening knob can be pulled up when equal pressure have been reached at the inler and the outlet of the valve.
8. Wrong polarity, wrong voltage or prolonged power on may damage the electromagnetic coil.
9.Our guarantee does not include any damage to the valve or loss of parts due to keeping or actions in violative regulations.
Wiring Requirements
1.Cable:dual core.3×0.75mm2 Or above
2. Length of cable < 50meters
Maintenance
Inspection must be done regularly,open and close it ,In case of failure, notify the contractor immediately for repair.